Ut enim ad minim veniam, quis nostrud exercit minidon ullamco nostrud enim ad.
26/7/2023
Vertical structural elements of the 5thresidential floor are completed. Brickwork on the 1st residential floor is 90%complete, on the 2nd residential floor 50%.
Other news