Triumph Residence consists of 10-storey building with comfortable apartments, commercial premises,functional underground parking and guest parking near the house. We offer you convenient apartmentlayouts that will be comfortable for a family to live in or to rent out. Many apartments have large loggiasand terraces from which you can enjoy the sea and mountain views.
The residential complex has a convenient location. The city center, hypermarkets and a farmers marketare within walking distance. The port with a ferry to Italy, city of Bari, is very close to the place. Citi Bar isalso a stopover for many cruise ships that ply the Adriatic coast. There is a large marina near the port.Here you can moor your yacht or rent a yacht.
Old Town Bar is 4 km away, where the ancient fortress is located, which can be seen from thewindows of the residential complex. The Old Oliva tree, which is about 2400 years old, grows in 3 kmaway. The town of Ulcinj with a long beach of healing volcanic sand is located in 27 km from Triumph Residence. The distance to the border with Albania is 32 km.
In the city next to the complex
A railway station with trains to Belgrade (Serbia), Podgorica (the capital), and Kolashyn (Montenegrin ski resort).
There is an international bus station nearby.
Ferry crossing from the city port to Bari (Italy), 226 km.
Picturesque beaches nearby
2-3 km
Bigowika
2-3 km
Crvena Stijena
8 km
Dobra Voda
4-5 km
Sutomore
4 airports can be reached from Bar
40 km
Podgorica Airport
60 km
Tivat Airport
110 km
Dubrovnik Airport (Croatia)
124 km
Tirana Airport (Albania)
All apartments are renovated
Finishing plaster. The walls are painted white.
Electrical wiring with electrical fittings (sockets, switches, without lamps).
Floor: parquet.
Bathroom: tiles, plumbing. Underfloor heating.
Вікна: алюмінієвий профіль.
Kitchen: tiles on the working wall.
Entrance and interior doors.
How to buy?
100% — fullpayment.
40 / 30 / 30% — 40% of the sum is due upon signing the agreement, 30% — after finishingthe frame and roof (December 2023), the last 30% - after commissioning.
30% — ofthe sum is due upon signing the agreement. After that a customer should payquarterly in equal instalments till the commissioning (December 2024).
Construction progress