Ut enim ad minim veniam, quis nostrud exercit minidon ullamco nostrud enim ad.
9/6/2023
Themonolithic frame of the 2nd residential floor is completed. Currently, the formwork pouring the floor slabbetween 2nd and 3rd residential floors is being collected.
Other news