23/2/2024
Tender for the facade of Triumph Residence installation was won by ATOZGROUP.
According to the terms of the tender, the facade will be insulated with an 8 cm layer of insulation. That is the most effective solution for the climate in Montenegro.
The company starts work on March, 4.