Preparations of the slab of green terrace on the 8th floor for applying waterproofing has been completed

12/4/2024

Preparationsof the slab of green terrace on the 8th floor for applying waterproofing hasbeen completed.

Other news

© Residential complex Triumph Residence. 2024.
Design & development Family Business Creative Bureau