Installation of the floor slab between 0 floor and 1 floor is completed

15/5/2023

Installationof the floor slab between 0 floor (commercial premises) and 1 floor (flats) iscompleted. Formwork for vertical structures of the 1 floor is underinstallation.

Other news

© Residential complex Triumph Residence. 2024.
Design & development Family Business Creative Bureau